Bridge Construction 10/5/2009

Prev | Next | Bridge Construction May to December

Loading...
(1371K)
Large rocks added upstream
Loading...
(1452K)
To protect the ends of the gabions
Concrete base sits on top
Loading...
(1377K)
Where beams will rest?
Loading...
(1374K)
Loading...
(1399K)
Wooden form
Loading...
(1358K)
Ramp down
Other end of form
Loading...
(1394K)
Water runs under concrete pad
Loading...
(1315K)
Loading...
(1357K)
Out the lower end
Loading...
(1382K)
Forms are lined up
Ready to make bridge
Loading...
(1345K)