Bridge Construction 11/12/2009

Prev | Next | Bridge Construction May to December

Loading...
(1320K)
Half of dirt pile removed
Loading...
(1377K)
Digging here too
Some went to block upper trail
Loading...
(1237K)
Wood for decking and fences
Loading...
(1380K)
Loading...
(1456K)
2 x 4's and posts
Loading...
(1437K)
Will it be as wide as the crossbeam?
Three *wooden* beams
Loading...
(1363K)
Temporary walkway
Loading...
(1364K)
Loading...
(1330K)
Falls
Loading...
(1145K)
Downramp
Water goes over concrete pad now
Loading...
(1165K)
But under gabions
Loading...
(1307K)
Loading...
(1312K)
Trucksville side
Loading...
(1307K)
Luzerne side
Straight shot
Loading...
(1428K)
Upstream protection
Loading...
(1336K)
Loading...
(1252K)
Luzerne side
Loading...
(1381K)
Beams across
Fill in place on Trucksville side
Loading...
(1389K)
Still need fill on Luzerne side
Loading...
(1337K)
Loading...
(997K)
Beams not attached
Loading...
(1242K)
Resting on concrete "sofa"
Dirt to concrete to wood
Loading...
(1402K)
Downstream to DAMA
Loading...
(1419K)
Loading...
(1357K)
Sofas rest on gabions
Loading...
(1391K)
Concrete on rocks
Five holes?
Loading...
(1332K)
Dirt tamped down
Loading...
(1358K)
Loading...
(1424K)
Three beams and crosspiece
Loading...
(1330K)
Trucksville side upstream
Stream path
Loading...
(1319K)
Jumble of falls
Loading...
(1278K)
Loading...
(1369K)
Bridge to be built
Loading...
(1432K)
Upstream on Luzerne side
Downstream
Loading...
(1340K)
Water leaving pad
Loading...
(1311K)

Prev | Next | Bridge Construction May to December