Back Mt Trail Logo The Back Mountain Trail
Transforming Railroads into Greenways!
ASTA logo:

 
Home

About

Directions

Links

Maps

Membership

Newsletters

Photos

Rules

Trains to Trails

Why a Trail?



Membership

Login

 
 

Bridge Construction 11/13/2009

Prev | Next | Bridge Construction May to December

Loading...
(1440K)
Halfway across
Loading...
(1323K)
Closed with tape
Bracing for handrails
Loading...
(1360K)
From underneath
Loading...
(1134K)
Loading...
(1305K)
Through to DAMA
Loading...
(1127K)
Gabion supports
Building up the Luzerne approach
Loading...
(1382K)
View towards Trucksville
Loading...
(1234K)
Loading...
(1348K)
2 x 4's on end
Loading...
(1331K)
Closing in
Bridge base
Loading...
(1277K)
Alignment
Loading...
(1071K)
Loading...
(1179K)
2 x 4's nailed to others
Loading...
(1181K)
12 foot pieces for rail support
Angles
Loading...
(1309K)
Concrete support
Loading...
(1356K)
Loading...
(1322K)
End pieces trimmed
Loading...
(1348K)
Gravel to concrete to wood
Trucksville end almost done
Loading...
(1430K)
Dirt pile remains
Loading...
(1324K)
Loading...
(1454K)
Drainage needs adjustment
Loading...
(1205K)
Waterflow?
Not low enough
Loading...
(1350K)
Even with trailbed
Loading...
(1338K)
Loading...
(1448K)
Flattened trail...

Prev | Next | Bridge Construction May to December




Last update: Friday, December 18, 2009 at 4:04:38 PM.
Webmaster: john.koch@wilkes.edu