Back Mt Trail Logo The Back Mountain Trail
Transforming Railroads into Greenways!
ASTA logo:

 
Home

About

Directions

Links

Maps

Membership

Newsletters

Photos

Rules

Trains to Trails

Why a Trail?



Membership

Login

 
 

Bridge Construction 11/16/2009

Prev | Next | Bridge Construction May to December

Loading...
(1350K)
Decking is completed
Loading...
(1403K)
Siderails coming along
Baskets in sun
Loading...
(1350K)
Siderails with a cap
Loading...
(1435K)
Loading...
(1293K)
Three rails
Loading...
(1328K)
Rail supports
Fill still to come on Luzerne side
Loading...
(1448K)
Trucksville side fill done
Loading...
(1341K)
Loading...
(1332K)
View of gabions
Loading...
(1084K)
Through to DAMA
Underside
Loading...
(1064K)
3 large beams
Loading...
(1098K)
Loading...
(1395K)
Downstream
Loading...
(1205K)
Underside of decking
And supports
Loading...
(968K)
Aligned
Loading...
(1140K)
Loading...
(1041K)
Bracing
Loading...
(1160K)
Outside rails
Upstream barrier
Loading...
(1357K)

Prev | Next | Bridge Construction May to December




Last update: Friday, December 18, 2009 at 4:06:57 PM.
Webmaster: john.koch@wilkes.edu