Back Mt Trail Logo The Back Mountain Trail
Transforming Railroads into Greenways!
ASTA logo:

 
Home

About

Directions

Links

Maps

Membership

Newsletters

Photos

Rules

Trains to Trails

Why a Trail?



Membership

Login

 
 

Bridge Construction 11/19/2009

Prev | Next | Bridge Construction May to December

Loading...
(1377K)
Posts to stop vehicles
Loading...
(1350K)
Concrete "wings" to protect bottom of gabions
Along gabion base
Loading...
(1404K)
Both sides
Loading...
(1453K)
Loading...
(1233K)
Around upstream corner
Loading...
(1276K)
Next to rock
Both sides
Loading...
(1344K)
Upstream barriers
Loading...
(1344K)
Loading...
(1330K)
With rocks
Loading...
(1276K)
Still working on railings
Posts at both ends - how long will they last?
Loading...
(1250K)
Downstream end
Loading...
(1366K)
Loading...
(1346K)
Other side
Loading...
(1277K)
Tied in
Other side
Loading...
(1357K)
Upstream rocks
Loading...
(1355K)
Loading...
(1336K)
Other side
Loading...
(1393K)
Mark was right - new area to be used for compost

Prev | Next | Bridge Construction May to December




Last update: Friday, December 18, 2009 at 4:12:25 PM.
Webmaster: john.koch@wilkes.edu