Bridge Construction 6/10/2009

Prev | Next | Bridge Construction May to December

Loading...
(1330K)
Tree leaning yesterday is now
Loading...
(1413K)
parallel to ground
Path through sumac
Loading...
(1268K)
No one wants to move it
Loading...
(1443K)
Loading...
(1211K)
Roots pulled out
Loading...
(1241K)
Propped up
Torn limb
Loading...
(1127K)
Cleared out
Loading...
(1234K)
Loading...
(1379K)
The underbrush
Loading...
(1330K)
Shovel pulling out of the ravine
Lower pipe is out
Loading...
(1329K)
Going higher
Loading...
(1331K)
Loading...
(1204K)
Rough on pipe...
Loading...
(1066K)
Bent and hauled with strap
Higher still
Loading...
(1355K)
Upper pipe intact
Loading...
(1359K)
Loading...
(1384K)
Now cleaning up
Loading...
(1242K)
Pulling dirt up
In front of shovel
Loading...
(1352K)
From below - stream filter barrier
Loading...
(1211K)
Loading...
(1354K)
Below pipe
Loading...
(1406K)
Got some wires
Up ramp towards prairie
Loading...
(1429K)
Large dirt pile
Loading...
(1425K)
Loading...
(1364K)
Can barely get by it on right
Loading...
(1307K)
Filled in drainage ditch too

Prev | Next | Bridge Construction May to December