Back Mt Trail Logo The Back Mountain Trail
Transforming Railroads into Greenways!
ASTA logo:

 
Home

About

Directions

Links

Maps

Membership

Newsletters

Photos

Rules

Trains to Trails

Why a Trail?



Membership

Login

 
 

Bridge Construction 6/12/2009

Prev | Next | Bridge Construction May to December

Loading...
(1294K)
As of 11 am Thursday
Loading...
(1324K)
There was 1 pipe left
Flattened out
Loading...
(1315K)
Tough to move
Loading...
(1325K)
Loading...
(1440K)
One pipe at top of ramp
Loading...
(1371K)
With trucks
Friday morning - man in hole
Loading...
(1344K)
No more pipe
Loading...
(1379K)
Loading...
(1396K)
Torn side
Loading...
(1347K)
Lots of rocks
Stream bed
Loading...
(1192K)
Gabions on the Trucksville side
Loading...
(1393K)
Loading...
(1461K)
Pick up rocks
Loading...
(1313K)
Basket setup
Lots to pick from
Loading...
(1384K)
Upstream
Loading...
(1202K)
Loading...
(1406K)
More baskets
Loading...
(1376K)
Flowering
Muddied
Loading...
(1340K)
Earth mover
Loading...
(1312K)
Loading...
(1369K)
Teamwork
Loading...
(1316K)
Positioned
Uphill side
Loading...
(1316K)
Downstream
Loading...
(1318K)
Loading...
(1277K)
Choosey
Loading...
(1243K)
Width of bed between baskets

Prev | Next | Bridge Construction May to December




Last update: Friday, December 18, 2009 at 3:41:22 PM.
Webmaster: john.koch@wilkes.edu